Sivok-Rangpo Rail Project achieved another milestone gets breakthrough in Tunnel 11
The length of Main Tunnel is 3232 m and of Evacuation Tunnel is 960 m, located in between Tarkhola and…
The length of Main Tunnel is 3232 m and of Evacuation Tunnel is 960 m, located in between Tarkhola and…